← All work

Industrial equipment sales

A business case built from the site up.

Build the commercial case from the site visit. A guided sales application carries the survey, labour model, machine basket and assumptions into a saved cost comparison and generated proposal.

  • Power Apps
  • SharePoint
  • Power Automate

Start with the work that needs to improve.

A sales business case must connect the actual site, labour and machine selection to the numbers presented to the customer. The original app lost analyses and calculated from highlighted dropdowns instead of the selected fleet.

A saved proposal connects the site survey, machine basket, cost model and customer document.

The system behind the work

See how the work connects.

Choose a business view, follow its path, then see the related project screen.

Sales workflow

Saved proposal

Calculation & documents

Commercial review

The related project screen

Understand the site

Site audit

Select the screen to inspect
Site audit — Industrial equipment sales.

Original project prototype: site audit, with sample records.

01 / 04

Build the fleet

Machine basket

Select the screen to inspect
Machine basket — Industrial equipment sales.

Original project prototype: machine basket, with sample records.

02 / 04

Review the case

Review the business case

Select the screen to inspect
Review the business case — Industrial equipment sales.

The same sample proposal compares five-year modelled costs and savings. The result labelled ‘Total Co-Botics Investment’ includes capital allocation, maintenance and labour across five years; it is not the fleet purchase price or realised savings.

03 / 04

Create the proposal

Proposal summary

Select the screen to inspect
Proposal summary — Industrial equipment sales.

The proposal brings equipment and model outputs together. Its investment figure combines the purchase price of both comparison fleets plus one maintenance term; it differs from the five-year modelled cost total.

04 / 04
02 / 06

Current operation

Original project prototype: current operation, with sample records.

Current operation — Industrial equipment sales.
Inspect the full screen
04 / 06

Cost assumptions

Original project prototype: cost assumptions, with sample records.

Cost assumptions — Industrial equipment sales.
Inspect the full screen

One system. A clearer way of working.

A traceable commercial proposal built from the selected site, labour and machine assumptions.

What we delivered

  • A saved proposal from site survey to machine selection
  • Cost and cash-payback modelling from explicit assumptions
  • Proposal generation using the calculated results

Original project prototype with anonymised sample data. The screens explain the workflow; implementation details are supported separately by project records.

Discuss a similar challenge

Project image

Original project prototype: site audit, with sample records.

THE NEXT STEP

Start with the process you want to improve.

We’ll map the process, the people and your Microsoft environment, then clarify the scope and next step.